Finishing & Packaging

Every hot tub should be wet tested before it leaves the factory The water must then be thoroughly drained from the hot tub prior to packing

Every hot tub should be wet tested for leaks and performance

The hot tubs must be drained before packaging and shipping

Insulated panels are added hot tub is strapped and wrapped

The side panels are usually added at the end of the process to avoid damage. These panels have an insulation material on the inside

Finally, the hot tub is wrapped and strapped to a pallet for handling

Hot Tubs ready for shipping Loading the hot tubs

An order of hot tubs ready for despatch

The hot tubs are loaded into a container for shipping to the UK and onwards to your garden!

© 2014/24 Surespa Ltd